OUR PERFORMANCE
PROJECT PORTFOLIO
ACTIVE & ONGOING PROJECTS
Exterior Granite Repair Construction
Providing new exterior sealant around penetrations to match existing mortar joints, utilizing closed-cell polyethylene foam backing rods, and repairing exterior granite across the medical center campus.
Masonry
Granite Repair
Exterior Sealant
Active
Contract Value
$16,253,175
Upgrade Fire Alarm System Campus Wide
Comprehensive design and construction task order to upgrade the campus-wide fire alarm system across the entire Perry Point VA Medical Center campus.
Design-build
fire alarm
life safety
campus-wide
Active
Contract Value
$8,366,197
Legionella – Phase 1 Hot Water Circulation Improvements
Plumbing and electrical upgrades to address Legionella risk at an occupied VA medical facility, including a new water treatment room, 12-inch incoming water line, cold water riser replacement, hot and cold water recirculation piping and pumps, and anti-scald mixing valves — completed in strict compliance with ICRA and ILSM requirements.
Plumbing
electrical
MEP
water treatment
Occupied Facility
Active
Contract Value
$7,869,350.00
FJ Holistic Health & Fitness (H2F) B2100 Renovation FY26
First and second-floor base bid renovations, encompassing both design and firm-fixed-price construction phases for the Holistic Health and Fitness facility.
design-build
military facility
Interior Renovation
firm-fixed-price
Active
Contract Value
$6,485,898
COMPLETED: FACILITIES & MEP UPGRADES
FACILITIES & MEP UPGRADES
VA Community Living Center (CLC) Renovation
Renovation of occupied support areas including interior demolition, new partitions, ceilings, flooring, doors, and finishes. Also included HVAC system modifications, electrical and lighting upgrades, and fire protection modifications.
interior renovation
hvac
electrical
fire protection
occupied facility
Completed
Contract Value
~$9.5M
Upgrade Chillers / Cooling Towers
Upgraded existing chiller plant with a new prefabricated modular chiller plant featuring two 1,500-ton chillers and three 1,000-ton cooling tower cells.
mechanical
chiller plant
cooling towers
mep
Completed
Contract Value
$7,874,000
Independence Square HVAC System Replacement
Multi-phased mechanical infrastructure upgrade across five historically significant buildings including Independence Hall and Congress Hall. Demolished and replaced eight custom AHUs, hydronic piping pumps, and humidifiers. Integrated UV-C lamp systems and ozone-free bipolar ionization. Navigated strict historic preservation guidelines with a Historic Preservation Treatment Plan (HPTP) and relocation of 394 museum collection objects. Engineered temporary climate control with wireless, cloud-based monitoring to maintain strict 30-day downtime limits.
hvac
historic preservation
ahu replacement
mechanical
multi-phase
national historic site
Completed
Contract Value
$4,917,879
VA Valley Forge Administrative Renovation
Interior renovation of administrative office space including demolition and reconfiguration of partitions, HVAC system extensions, LED lighting, and DataCom cabling. Included lead-based paint abatement.
interior reservations
hvac
led lighting
datacom
abatement
Completed
Contract Value
$3.6M
COMPLETED: CIVIL, PAVING & SITE UPGRADES
CIVIL, PAVING & SITE UPGRADES
Station Wide Road, Curb & Drainage Reconstruction
Full road and drainage system replacement including asphalt, curb, and base course over the entire VA campus.
civil
asphalt
drainage
road reconstruction
Completed
Contract Value
$4,304,933
Restripe, Seal & Maintenance on Parking Garages
Seal coating, methacrylate treatment, re-striping, and phased garage accessibility management across 3 multi-level parking garages.
parking structure
seal coat
ada
paving
Completed
Contract Value
$3,470,000
Perry Point VAMC Paving & Concrete Upgrades
Demolition and replacement of concrete, curbs, and gutters across the Perry Point VA Medical Center campus.
concrete
curb & gutter
demolition
paving
Completed
Contract Value
$770,329
Construct Restroom & Storage Buildings
Constructed a pre-manufactured double-vault restroom building with two unisex toilet rooms and a pre-storage/mechanical building. Scope included a vegetative wind screen, demolition, site preparation, erosion control, excavation, backfilling, grading, foundations, concrete walkways, utility connections, irrigation modifications, and landscaping.
pre-fab
site work
utilities
landscaping
grading
Completed
Contract Value
$452,904
COMPLETED: BUILDING ENVELOPE, HISTORICAL & INTERIOR REPAIR
BUILDING ENVELOPE, HISTORICAL & INTERIOR REPAIR
Correct Building Envelope Site Wide
Restoration of scuppers, roof drains, masonry tuck-pointing, metal/parapet flashing, and replacement of slate shingles, alongside lead paint and asbestos abatement.
masonry
roofing
abatement
building envelope
historic preservation
Completed
Contract Value
$2,474,340
Shenandoah National Park Headquarters
Repairing a historic roof, replacing gutter systems, building a new concrete retaining wall, and replacing existing fencing with a new metal guardrail system.
historic preservation
national park
masonry
structural
guardrail
Completed
Contract Value
$1,659,482
Tahoe & Eldorado National Forest Roof Replacements
Roof replacements for eighteen buildings across multiple districts of the Tahoe and Eldorado National Forests.
roofing
multi-building
federal facility
Completed
Contract Value
$1,031,819
Montrose Park Comfort Station Rehabilitation
Multi-trade coordination including replacement of heating, ventilation, electrical, and plumbing utilities. Included slate roof rehabilitation, brick façade repointing, and ABAAS modifications to site screen walls and sidewalks.
multi-trade
roofing
masonry
mep
ada
Completed
Contract Value
$496,233